In addition the proposal seeks to add a wood burning stove to the ground floor of the existing living space, replacement of the hedge to the eastern boundary with a 2m high blockwork wall, a 10m long outdoor swimming pool with surrounding decked area and a first floor balcony space.
Cladding materials have been selected from a natural palette in ordered to blend in with the rural environment and the existing material palette
On Site
Work began on site in January 2023 with contractor Breton Construction.