DLM Architects

The Barn

Wednesday, February 13th, 2019

Works are progressing well on site at the Barn.  The cantilevered staircase and bridge have been fabricated and installed by Stainless Steel Fabrications and the reclaimed oak treads are being CNC machined at Swan joinery and assembled ready for fitting when decorations complete.  The double height lobby blends a contrast of traditional reclaimed material with modern engineered fabrication techniques, providing a soft and natural transition between the protected structure and internal fit out.

Share this